• City of South Bend and St. Joe County HVAC Permit

  • Please be advised:

    • If applying a duplex or a multi-building, please complete separate applications for each unit
    • Payment for permit can be completed in-person at City Hall with a company card or check and can't be made over the phone
    • Receipt of application does not mean a permit has been issued
    • If work has been started without a permit being issued, fines may be issued

     

     

  • About You

  • Who are you filing this application as?*
  • About Property and Property Owner

  • Format: (000) 000-0000.
  • Is the mailing address the same as the project address?*
  • About Project

  • Is this part of any renovation work or construction project?*
  • List fuel type (gas, oil, or electric) and capacity (BTU or kW) for each furnace*
  • List the tonnage, whether or not the system is a replacement (Yes or No), and whether or not the system is water sourced (Yes or No) for each system*
  • CFM Rating for each system*
  • Exhaust CFM Rating for each system*
  • Have you obtained your State Design Release?
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • List the tonnage for each unit*
  • List the capacity (BTU) and the system type (Hot Water or Steam) for each boiler
  • List the CFM Rating for each unit*
  • Any generator gas line work?*
  • Is there a gas reconnection?*
  • Any other HVAC work?*
  • About Contractors

  • Format: (000) 000-0000.
  • Terms and Conditions

  • By typing my name in the boxes below, I agree that I'm electronically signing this form. I affirm that the information that I've provided is accurate and true to the best of my knowledge. I understand that my electronic signature is legally binding and equivalent to my handwritten signature.

  • Date*
     - -
  • We Would Love Your Feedback!

    Let us know what you think of this experience before clicking "Submit" to complete the application.
  • Should be Empty: